Skip to content
Get a quote
Choose your energy
Natural gas
Electricity

Wind energy SUDWAND

Regional wind energy

In 2018, SUDenergie founded SUDWAND S.A., in which it holds a 60% share. SUDWAND is responsible for developing wind power projects in SUDenergie’s shareholder municipalities. The construction of two wind turbine installations with an estimated annual energy production of 15.3 million kWh is planned for 2021. This is equivalent to an average annual consumption of about 4,800 households (about 14,400 people).

The idea was to build a wind farm that could provide our customers with green electricity with the lowest possible carbon footprint. Wind energy has now established itself as one of the best technologies, as wind turbines are CO2-neutral just nine months after they were put into operation. Wind power therefore plays an important role in our sustainability plan.

Alain Fürpass, Director
Our sustainable solutions

Key facts of phase 1

wind turbines
2
capacity
8.52 MW
Annual production
15.3 M kWh
Number of households (4 pers.) that could be supplied with our electricity per year
3,400
CO2 reductions per year
9,960 tonnes

Setting up a wind turbine

Overview of our installations

    All
    Solar plants
    Wind turbines